Canary Wharf

Tradewoods were involved in the development at Canary Wharf for almost 2 years before the project commenced. Liaising with the designers and firming up final specifications with the architectural team, Tradewoods assisted in drawing up a tight specification for Tradewoods 3-Strip Oak to be laid over a heated subfloor.

Several alternatives were examined before the final choice of hardwood floor covering was made, but it was decided that Tradewoods 3-Strip Oak gave the appartments a classic feel whilst complimenting the comtemporary and moderm build.

Over 2500m² of flooring was installed in total, with the whole project being completed two weeks ahead of schedule.